You are here: First ideas

How do I propose at Christmas if the ring is not ready?

The Christmas order-by date has passed. Propose with the design in hand and let the ring follow, four to six weeks after the design is approved.

Calendar strip, 12 November to 9 February: four to six weeks before Christmas Eve, the 19 November order-by date, a 29 December example approval.

Propose with the design, not the ring. The studio’s Christmas order-by date, Thursday 19 November, has passed. Book the free design session, propose with the written design summary in hand, and let the ring follow, four to six weeks after the design is approved. A stand-in or a plain promise can fill the gap.

Has the Christmas order-by date passed?

Yes. The studio’s bridal collection page gave this line: “order a piece whose design is ready by Thursday 19 November, to have it in hand by Christmas Eve.”

Whether Christmas can still be met is a question for the studio. If your date is tight, ask early.

Calendar strip, 12 November to 9 February: four to six weeks before Christmas Eve, the 19 November order-by date, a 29 December example approval.
Counted back from Christmas Eve, four to six weeks is 12 to 26 November; the studio's own order-by date was 19 November; an example design approved on 29 December puts the ring in hand between 26 January and 9 February.

Counted back from Christmas Eve, Thursday 24 December, the four to six weeks after approval start between 12 and 26 November. The studio’s own date, 19 November, falls inside that window.

Can I propose with the design instead of the ring?

Yes, and it does not depend on the ring being finished.

Book the free design session. It lasts one hour, in the Jewellery Quarter or by video, with no obligation. You get honest numbers split across metal, centre stone, design and making, and a written design summary that you keep either way.

Say the fixed date at the start: the design-session page says the plan is then worked backwards from that date before you commit to anything. The studio’s free guide, Before You Propose, is a good place to start.

What if I approve the design before Christmas and let the ring arrive after?

That works: the same plan, decided earlier. From the day the design is approved, four to six weeks is the honest working range for most commissions, and delivery is inside it.

The strip uses a later date as its example: a design approved on Tuesday 29 December puts the ring in hand between Tuesday 26 January and Tuesday 9 February.

The studio’s guides to approving a ring design before it exists and how long a bespoke ring takes go into more detail.

Can I use a stand-in ring, and can it go back?

You can, but check the return terms first: whether a stand-in can go back depends on how and where you buy it, and on the seller’s terms. A stand-in is a plain, inexpensive ring that you swap for the real one.

Two pages of the Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 help, as far as they go. Under regulation 30 the normal cancellation period for goods “ends at the end of 14 days” after the day the goods are received. Regulation 28 lists circumstances that exclude cancellation, and paragraph (1)(b) is “the supply of goods that are made to the consumer’s specifications or are clearly personalised;”. That is the law’s wording.

Those pages do not say which sales the right covers, so this piece does not either. A ring designed for you may fall in the personalised group, so approve the design only when you are sure. This is not legal advice.

What if I only promise the ring?

Say plainly what is coming and when, then choose together or keep it a surprise. Count forward from your approval day, as the strip does. See the studio’s piece on choosing the ring together or a surprise.

One thing to do this week: book the session and say the date first.

How we measured

The four-to-six-week range is published on the design-session page and the bespoke page. Christmas Eve 2026 (Thursday 24 December) and the 19 November order-by date are from the Christmas line on the bridal collection page. Every other date is calendar arithmetic: six weeks and four weeks before 24 December, and four and six weeks after an example approval on Tuesday 29 December.

When this does not apply

This advice is for a proposal date that can be met with a design in hand. If the ring itself must be on the finger that day, ask the studio first; this plan does not promise it. The law here is only what the two legislation pages say.

Sources

  1. The National Archives, legislation.gov.uk, Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 (SI 2013/3134), regulation 28: Limits of application: circumstances excluding cancellation, no date shown on the page, version up to date to 14 November 2026, opened 14 November 2026, https://www.legislation.gov.uk/uksi/2013/3134/regulation/28
  2. The National Archives, legislation.gov.uk, Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 (SI 2013/3134), regulation 30: Normal cancellation period, no date shown on the page, version up to date to 12 November 2026, opened 14 November 2026, https://www.legislation.gov.uk/uksi/2013/3134/regulation/30
  3. Silux London, Design session, undated page, checked 14 Nov 2026, opened 14 Nov 2026, https://www.siluxlondon.com/bespoke/design-session
  4. Silux London, Bridal collection, Christmas order-by line, undated page, checked 14 Nov 2026, opened 14 Nov 2026, https://www.siluxlondon.com/collections/bridal
  5. Silux London, Bespoke commissions, lead time and the Four-Week Promise, undated page, checked 14 Nov 2026, opened 14 Nov 2026, https://www.siluxlondon.com/bespoke

Last checked: 14 November 2026.